Kitchen Renovation – Part III
More kitchen updates! This one includes the installation of our beautiful Brazilian Koa hardwood floor, the cabinet doors and drawers, and the floorboards. We originally were going to put down standard 3/4″ Cherry flooring in the kitchen only, but after realizing that it would require another 3/4″ subfloor for installation, and that we’d have a major tripping hazard from the adjoining rooms, we scrapped the idea and purchased the 3/8″ Koa. We also decided to put it in both the kitchen and dining room as well as install it at an angle, rather than parallel to the walls. This proved to be a major design windfall as it completely acentuates the two rooms perfectly.
Christmas shooting
Merry Christmas 2008!
We spent Henry’s first Christmas back in NM with Joe, Oma, Holly and Scott. It was great and Henry had his first experience in snow. It was about 15 degrees outside and I took him out for a stroll in the white stuff. After about 5 minutes, he was crying and wanted to back inside. Guess he’s a desert rat already!!