Master Bathroom Renovation Part 1

So, I know we told everyone that we were probably going to wait until later on in the year to tackle the master bathroom…but we just couldn’t do it. We were both feeling plucky and anxious and decided to start it while Tom had a good chunk of time off. For the past 2 weeks we’ve been tearing down walls, digging up concrete, shoveling dirt and nearly exhausting ourselves trying to get this thing done. Wow is all I can say. We’re probably about half way done but the hardest stuff is out of the way. Now we just have to put up drywall,  add the toilet and vanity, tile the floor, put in the door and fix the outside sheetrock in our bedroom. It’ll take a little longer than we expected, but I’m just glad we’ve started it. It’s going to look amazing!!

Getting all our crap out of the shower
The beautiful linoleum (Ugh)
Wall between shower and vanity
Tearing the tiles off the wall
Us in our mega masks
Bare bones
Pulling up linoleum
Taking off the trim
Our plastic door - trying to cut down on the dust
Exposed lines for the sinks
Tommy trying to figure out where all the electrical is going to go
Insulation and crap everywhere!!
Poor little mouse found inbetween the walls
Me chipping away at the shower tile
Standing over my kill
Digging out the hole for the new toilet pipe
Slowly making the hole bigger
Shower drain
Both drains (shower and toilet) finally dug out
Both extended and capped
Filled with concrete
After we expanded the shower, we had to give it a nice clean edge
Poor Tommy's back about to go out!
Looking through the hole for the skylight
Tommy done with the duct work
Skeleton for new shower wall
Standing inside of expanded shower looking at Tommy's concrete work